2001the grid as it was

A new day for energy

Helping our clients deliver the transition, sooner.

Wind Solar Storage Existing 132 kV Upgrading Energised 330 kV

Terminals and corridors follow WA's SWIS Transmission Plan / Clean Energy Link (e.g. Northern Terminal → Pinjar → Regans → Cataby → Eneabba → Three Springs). Connection points are indicative at the terminal level; generation on public-record commissioning dates. A stylised schematic, not a load-flow model.